2019-03-01

Handan Youfa Steel Pipe Co., Ltd. Information Disclosure


Handan Youfa Steel Pipe Co., Ltd. Information Disclosure

1. enterprise background introduction

Handan Youfa Steel Pipe Co., Ltd. (hereinafter referred to as "Handan Youfa") was established in August 2010, invested and built by Tianjin Youfa Steel Pipe Group Co., Ltd., and is located in the Shangcheng Industrial Zone, Cheng'an County, Handan City. Handan Youfa has 765 mu of construction land, spanning the east and west two houses. The east hospital covers 500 mu and the west hospital covers 265 mu. The products cover 12 kinds of straight seam welded steel pipes of 4 to 8 inches, spiral steel pipes of various specifications from 30 219 to 30 1600mm, and galvanized square rectangular pipes below F100. Invest in the construction of acid treatment and water treatment projects, focus on the treatment of waste acid and wastewater throughout the company, so as to meet the discharge standards.

Since its establishment, Handan Youfa has adhered to the group's strategic deployment. According to the raw material resources, radiation area, market share and other conditions, Handan Youfa has implemented the overall plan step by step in a timely and appropriate manner, and completed the supporting construction of straight seam welded pipe, galvanized welded pipe, spiral pipe, steel plastic composite pipe, welded square rectangular pipe, galvanized square rectangular pipe and other engineering projects. At the same time, standardize and obtain all kinds of licenses. Successfully passed the environmental protection acceptance and obtained the "Discharge Pollutant Permit", and passed the ISO14001 and OHSAS18001 management system certification.

2. enterprise basic information

Unit name: Handan city youfa steel pipe co., LTD

Organization code: 91130424557664648C

Legal Representative: Dong Xibiao

Production address: Cheng'an County, Handan City, Hebei Province, industrial mall

Contact Information: Lian Xuetao (13931012451)

The main content of production, operation and management services: production, sales and research and development of high-frequency welded pipes, hot-dip galvanized steel pipes, steel-plastic composite pipes, spiral steel pipes, square rectangular pipes, and square rectangular galvanized pipes.

Products and scale: all kinds of steel pipe 4.38 million tons/year, waste acid treatment 30000 tons/year

3. sewage information

In the production process of Handan Youfa Steel Pipe Co., Ltd., the main sources of pollutants are waste gas, waste water, noise, and solid waste. The pollutant discharge points are shown in the figure below.

 

1. Exhaust gas

Serial Number

Type of pollution source

Product category

Exhaust gas generation process

Main Pollutants

1

organized emissions

Galvanized welded pipe

Pickling

HCl

2

hot air drying

Particulate matter, ammonia

3

hot-dip zinc

Particulate matter,SO2,NOx

4

Blow inside, blow outside

Particulate matter

5

hot-dip galvanized rectangular tube

Pickling

HCl

6

hot air drying

Particulate matter, ammonia

7

hot-dip zinc

Particulate matter,SO2,NOx

8

Blow inside, blow outside

Particulate matter

9

Boiler

Particulate matter,SO2,NOx

10

Pickling waste liquid treatment

neutralization stirring

HCl

11

oxidation reaction kettle

HCl

12

Insulation pool

HCl

13

Unorganized discharge

straight seam welded pipe

Welding

Particulate matter

14

spiral welded pipe

Welding

Particulate matter

15

Special-shaped square tube

Welding

Particulate matter

16

rigid plastic composite pipe

Inner wall blast cleaning

Particulate matter

17

plastic pipe extrusion

non-methane total hydrocarbon

18

rigid-plastic composite

non-methane total hydrocarbon

2. Waste water

Serial Number

Type of pollution source

Main Pollutants

Generate Features

Name of discharge port

Emission mode

1

production wastewater

pH,COD,BOD5ammonia nitrogen,SSPetroleum, animal and vegetable oils,Zn,Fe

Intermittent

General outletDW001

Indirect emissions

2

Domestic sewage

pH,COD,BOD5ammonia nitrogen,SSAnimal and vegetable oil

Intermittent

General outletDW001

Indirect emissions

3. Pollutant emission concentration

Serial Number

Corresponding process

Discharge Point No.

Name of pollutant

Monitoring frequency

emission concentrationmg/m3

Standard concentration limitmg/m3

Standard

Whether it is up to standard

1

heating furnace

1#

Particulate matter

1Times/Season

 

20

Emission Standard for Air Pollutants from Industrial Furnaces (DB13/1640-2012

 

2

SO2

1Times/Season

 

50

 

3

NOx

1Times/Season

 

150

 

4

2#

Particulate matter

1Times/Season

 

20

 

5

SO2

1Times/Season

 

50

 

6

NOx

1Times/Season

 

150

 

7

3#

Particulate matter

1Times/Season

 

20

 

8

SO2

1Times/Season

 

50

 

9

NOx

1Times/Season

 

150

 

10

4#

Particulate matter

1Times/Season

 

20

 

11

SO2

1Times/Season

 

50

 

12

NOx

1Times/Season

 

150

 

13

5#

Particulate matter

1Times/Season

 

20

 

14

SO2

1Times/Season

 

50

 

15

NOx

1Times/Season

 

150

 

16

6#

Particulate matter

1Times/Season

 

20

 

17

SO2

1Times/Season

 

50

 

18

NOx

1Times/Season

 

150

 

19

7#

Particulate matter

1Times/Season

 

20

 

20

SO2

1Times/Season

 

50

 

21

NOx

1Times/Season

 

150

 

22

8#

Particulate matter

1Times/Season

 

20

 

23

SO2

1Times/Season

 

50

 

24

NOx

1Times/Season

 

150

 

25

Zinc pot

1#

Particulate matter

1Times/Season

 

60

Emission Standard for Particulate Matter in Hot Dip Galvanizing Industry (DB13/1578-2012

 

26

Ammonia

1Times/Season

 

 

27

2#

Particulate matter

1Times/Season

 

60

 

28

Ammonia

1Times/Season

 

 

29

3#

Particulate matter

1Times/Season

 

60

 

30

Ammonia

1Times/Season

 

 

31

4#

Particulate matter

1Times/Season

 

60

 

32

Ammonia

1Times/Season

 

 

33

5#

Particulate matter

1Times/Season

 

60

 

34

Ammonia

1Times/Season

 

 

35

6#

Particulate matter

1Times/Season

 

60

 

36

Ammonia

1Times/Season

 

 

37

7#

Particulate matter

1Times/Season

 

60

 

38

Ammonia

1Times/Season

 

 

39

8#

Particulate matter

1Times/Season

 

60

 

40

Ammonia

1Times/Season

 

 

41

Pickling

1#

Hydrogen chloride

1Times/Season

 

100

Integrated Emission Standard for Air Pollutants (GB16297-2012

 

42

2#

Hydrogen chloride

1Times/Season

 

100

 

43

3#

Hydrogen chloride

1Times/Season

 

100

 

 

3#2

Hydrogen chloride

 

 

100

 

44

4#

Hydrogen chloride

1Times/Season

 

100

 

45

5#

Hydrogen chloride

1Times/Season

 

100

 

 

5#2

Hydrogen chloride

 

 

100

 

46

6#

Hydrogen chloride

1Times/Season

 

100

 

 

6#2

Hydrogen chloride

 

 

100

 

47

7#

Hydrogen chloride

1Times/Season

 

100

 

 

7#2

Hydrogen chloride

 

 

100

 

48

8#

Hydrogen chloride

1Times/Season

 

100

 

 

8#2

Hydrogen chloride

 

 

100

 

49

heating furnace

1#

Particulate matter

1Times/Season

 

20

Emission Standard for Air Pollutants from Industrial Furnaces (DB13/1640-2012

 

50

SO2

1Times/Season

 

50

 

51

NOx

1Times/Season

 

150

 

52

2#

Particulate matter

1Times/Season

 

20

 

53

SO2

1Times/Season

 

50

 

54

NOx

1Times/Season

 

150

 

55

3#

Particulate matter

1Times/Season

 

20

 

56

SO2

1Times/Season

 

50

 

57

NOx

1Times/Season

 

150

 

58

4#

Particulate matter

1Times/Season

 

20

 

59

SO2

1Times/Season

 

50

 

60

NOx

1Times/Season

 

150

 

61

Zinc pot

1#

Particulate matter

1Times/Season

 

60

Emission Standard for Particulate Matter in Hot Dip Galvanizing Industry (DB13/1578-2012

 

62

2#

Particulate matter

1Times/Season

 

60

 

63

3#

Particulate matter

1Times/Season

 

60

 

64

4#

Particulate matter

1Times/Season

 

60

 

65

Blow inside and outside

1#

Particulate matter

1Times/Season

 

60

Emission Standard for Particulate Matter in Hot Dip Galvanizing Industry (DB13/1578-2012

 

66

2#

Particulate matter

1Times/Season

 

60

 

67

3#

Particulate matter

1Times/Season

 

60

 

68

4#

Particulate matter

1Times/Season

 

60

 

69

Pickling

1#

Hydrogen chloride

1Times/Season

 

100

Integrated Emission Standard for Air Pollutants (GB16297-2012

 

 

1#2

Hydrogen chloride

 

 

100

 

70

2#

Hydrogen chloride

1Times/Season

 

100

 

 

2#2

Hydrogen chloride

 

 

100

 

71

3#

Hydrogen chloride

1Times/Season

 

100

 

 

3#2

Hydrogen chloride

 

 

100

 

72

4#

Hydrogen chloride

1Times/Season

 

100

 

 

4#2

Hydrogen chloride

 

 

100

 

73

Oxidation kettle, etc.

1#

Hydrogen chloride

1Times/Season

 

6.0

Emission Standard of Air Pollutants for Iron and Steel Industry (DB13/2169-2015

 

74

shot blasting

1#

Particulate matter

1Times/Season

 

120

Integrated Emission Standard for Air Pollutants (GB16297-2012

 

75

extrusion molding

2#

non-methane total hydrocarbon

1Times/Season

 

80

Emission Control Standard for Volatile Organic Compounds of Industrial Enterprises (DB 132322-2016

 

76

Benzene

1Times/Season

 

1

 

77

TOTAL OF TOLUENE AND XYLENE

1Times/Season

 

40

 

78

Gas waste gas

1#

Particulate matter

1Times/Season

 

20

Emission Standard of Air Pollutants for Boilers (GB13271-2014) Medium Table3Standard

 

79

2#

SO2

1Times/Season

 

50

 

80

3#

NOx

1Times/Month

 

150

 

81

4#

Blackness of smoke

1Times/Season

 

1

 

Serial Number

Corresponding process

Discharge Point No.

Name of pollutant

Monitoring frequency

emission concentrationmg/ L

Standard concentration limitmg/L

Standard

Whether it is up to standard

1

Waste water

General outletDW001

pH

Online

 

6~9

Water Pollution Discharge Standard for Iron and Steel Industry (GB13456-2012) The third-level discharge standard meets the water quality requirements of the sewage treatment plant in Shangcheng Industrial Park.

 

2

COD

Online

 

200

 

3

BOD5

1Times/Month

 

230

 

4

ammonia nitrogen

Online

 

15

 

5

SS

1Times/Month

 

100

 

6

Petroleum

1Times/Month

 

10

 

7

Animal and vegetable oil

1Times/Month

 

100

 

8

Zn

Online

 

4

 

9

Fe

Online

 

10*

 

Note:*Discharge wastewaterpHValue less7The standard limits are implemented when.

Serial Number

Corresponding process

Discharge Point No.

Name of pollutant

Monitoring frequency

Test ResultsdBA

StandarddBA

Standard

Whether it is up to standard

1

East boundary

Noise at boundary

1Times/Season

 

 

Emission standards for environmental noise at the boundary of industrial enterprises (GB12348-2008

 

2

South boundary

1Times/Season

 

 

 

3

West boundary

1Times/Season

 

 

 

4

North boundary

1Times/Season

 

 

 

4. Total emissions of pollutants in the previous year

Serial Number

Category

Name of pollutant

Emissions (t

1

atmospheric pollutants

Particulate matter

 

2

Sulphur dioxide

 

3

nitrogen oxide

 

4

volatile organic compounds

 

5

water pollutant

COD

 

6

ammonia nitrogen

 

7

total phosphorus

8

Total nitrogen

Including the names of major pollutants and characteristic pollutants, discharge methods, number and distribution of discharge outlets, discharge concentration and total amount, exceeding standards, as well as the implemented pollutant discharge standards and the approved total discharge;

Construction and Operation of Pollution Prevention Facilities in 4.

1. Exhaust gas treatment facilities

Sequence

No.

Pollution type

Exhaust gas generating facility or process

Main

Pollutants

treatment facilities or

Measures

Exhaust cylinder height

m

 
 

1

organized emissions

Acid mist absorption tower

HCl

Acid mist absorption room+alkali liquor absorption tower

15m

 

2

Galvanizing furnace

Particulate matter,SO2,NOx

Clean fuel combustion, collect and discharge

15m

 

3

Zinc pot

Particulate matter,NH3

Suction device at side of negative pressure groove+Bag filter

15m

 

4

15ton steam boiler

Particulate matter,SO2,NOx

Clean fuel combustion, collect and discharge

15m

 

5

waste acid regeneration

HCl

Gas collecting hood+Post discharge of alkali liquor absorption tower

15m

 

6

steel-plastic composite

non-methane total hydrocarbon

External discharge after photo-oxygen catalytic treatment

15m

 

7

Sand blasting

Particulate matter

Outflow after treatment by bag-type dust collector

15m

 

8

Canteen fume purification

Fume

Fume purifier

 

9

Unorganized discharge

Straight seam welded pipe, spiral welded pipe, special-shaped square pipe, steel-plastic composite pipe workshop

Particulate matter, non-methane total hydrocarbon

Bag filter and ventilation

 

2. Wastewater Treatment Facilities

Sequence

No.

Type of waste water

Wastewater generating facility or process

Main Pollutants

Processing

Process

Water quantity

(m³/d)

* Where to go

1

production wastewater

Galvanized welded pipe, hot-dip galvanized rectangular pipe, chemical water station, boiler wastewater

pH,COD,BOD5ammonia nitrogen,SSPetroleum, animal and vegetable oils,Zn,Fe

Neutralization+inclined plate precipitation process

97.6

Shangcheng Industrial Park Sewage Treatment Plant

2

Domestic sewage

Domestic sewage from staff office, dormitory and canteen

pH,COD,BOD5ammonia nitrogen,SSAnimal and vegetable oil

The canteen wastewater is pretreated by grease trap, and the rest of domestic water is pretreated by septic tank

Shangcheng Industrial Park Sewage Treatment Plant

3. Noise prevention measures

The noise production equipment in the factory mainly includes production and auxiliary facilities such as fans, uncoiler, leveler, high-frequency welding machine, flying shear, air compressor, roller table unit, material transfer and bundling, pumps, etc. After noise reduction by vibration reduction base, plant sound insulation and other measures, the environmental noise at the factory boundary can reach the standard.

4. Solid waste prevention and control measures

The waste generated by the company in the production process is divided into general industrial solid waste and hazardous waste.

General industrial solid waste mainly includes: scrap in the process of welded pipe processing (steel strip, sawing iron scrap and other metal waste), iron-containing waste recovered from waste acid station, waste roller produced by welded pipe transportation, filter cake produced by production wastewater treatment station, domestic waste and waste oil from oil separation tank.

Hazardous wastes mainly include: waste lubricant (waste engine oil, waste emulsion), waste cotton yarn (cloth), waste passivation solution from pretreatment of galvanized pipe, waste slag additive from galvanizing tank, sludge from pretreatment of galvanizing wastewater, waste zinc ash and waste zinc slag from pipe plating process, which are regularly delivered to hazardous waste qualified units for disposal.

Environmental Impact Assessment of 5. Construction Projects and Other Environmental Protection Administrative Licenses

Serial Number

Name of construction project

Environmental Impact Assessment

Completion environmental protection acceptance

Run

Status

Approval Department

Approval number

Approval time

Scale

Approval Department

Approval number

Approval time

1

Handan Youfa Steel Pipe Co., Ltd. Annual Production250Environmental Impact Report of Ten Thousand Tons of High Frequency Welded Pipe, Hot Zinc Steel Pipe and Shaped Square Pipe Project

Handan Environmental Protection Bureau

Handan Environmental Protection Bureau

[2010]

124No.

2010.5

Annual output of high frequency welded pipe110Ten thousand tons, hot galvanized steel pipe60Ten thousand tons, spiral steel pipe5010,000 tons, special-shaped steel pipe30million tons

Cheng'an County Environmental Protection Bureau

Ring test (2015006No.

2015.7

Normal

2

Handan Youfa Steel Pipe Co., Ltd. Annual Production250Supplementary Report on Environmental Impact Assessment of Ten Thousand Tons of High Frequency Welded Pipe, Hot Zinc Steel Pipe and Shaped Square Pipe Project

Handan Environmental Protection Bureau

Handan Environmental Protection Bureau

[2010]

124No.

2011.12

Normal

3

Environmental Impact Assessment Report of Steel-plastic Composite Pipe Project

Handan Environmental Protection Bureau

Han Huan Fu Shen[2014]02No.

2013.12

Annual production of various specifications of steel-plastic composite pipe8million tons

Handan Environmental Protection Bureau

Handan Ring Table[2013]129No.

2013.12

Normal

4

Environmental Impact Report Form of Nuclear Technology Application Project

Handan Environmental Protection Bureau

Handan Ring Radiation Inspection

[2015]02No.

2014.1

IncreaseXray industrial TV2Table (Class II ray device)

Handan Environmental Protection Bureau

Handan Ring Radiation Inspection[2015]02No.

2015.2

Normal

5

Handan Youfa Steel Pipe Co., Ltd. Square Rectangular Tube Series Product Expansion Project Environmental Impact Report

Handan Environmental Protection Bureau

Handan Environmental Protection Bureau

[2016]281No.

2016.1

Annual output of rectangular tube (black tube)80Tons, hot-dip galvanized square rectangular tube40Ten thousand tons, processing waste acid3million tons

Handan Environmental Protection Bureau

Handan Ring Inspection[2017]09No.

2017.3

Normal

Emergency plan for 6. environmental emergencies

The enterprise has formulated an emergency plan for environmental emergencies, which has been put on record by Handan Environmental Protection Bureau.

Handan Youfa Steel Pipe Co., Ltd. (Expansion Project of Square Rectangular Tube Series Products) Emergency Plan for Environmental Emergencies, Record No.: 130424-QT-2016-24

Handan Youfa Steel Pipe Co., Ltd. Emergency Plan for Environmental Emergencies, Record No. 130400-2015-111-M;

 

7. other environmental information

None

Purchase inquiry

We will fill in the following purchase order and submit it.15 minutesget in touch with you. If you have any questions, please call 400 for manual service.

We will fill in the following purchase order and submit it.

 15 minutesget in touch with you. If you have any questions, please call 400 for manual service.

Security verification
Submission