2019-01-03

"Handan Youfa Steel Pipe Co., Ltd. High Frequency Welded Pipe, Hot Galvanized Steel Pipe Reconstruction and Expansion Project" Publicity


Handan Youfa Steel Pipe Co., Ltd. high-frequency welded pipe, hot-dip galvanized steel pipe expansion project

 

Environmental impact assessment information publicity

1. Project Overview

Project Name: Reconstruction and Expansion Project of High Frequency Welded Pipe and Hot Galvanized Steel Pipe

Construction unit: Handan Youfa Steel Pipe Co., Ltd.

Project nature: reconstruction and expansion

Project Overview: Handan Youfa Steel Pipe Co., Ltd. invested 36 million yuan to renovate and expand the high-frequency welded pipe production lines and hot-dip galvanized high-frequency welded pipe production lines of two galvanized workshops and two welded pipe workshops in the east factory area. The project will not add new land and no new factory buildings. After the completion of the reconstruction and expansion project, there are 17 high-frequency welded pipe production lines with a production capacity of 1.7 million t/a. There are 10 hot-dip galvanized steel pipe production lines with a production capacity of 1.2 million t/a. See http://www.yfgg.com/article/content/view?id=5026。 for details of existing works and environmental protection

Construction Content: Handan Youfa Steel Pipe Co., Ltd. invested 36 million yuan to renovate and expand the high-frequency welded pipe production line and hot-dip galvanized high-frequency welded pipe production line of two galvanized workshops and two welded pipe workshops in the east factory area. The project will not add new land and no new factory buildings. After the completion of the reconstruction and expansion project, there are 17 high-frequency welded pipe production lines with a production capacity of 1.7 million t/a. There are 10 hot-dip galvanized steel pipe production lines with a production capacity of 1.2 million t/a.

Public Scope of 2. Consultation

Citizens and units in residential areas, schools, hospitals and other environmentally sensitive areas in a rectangular area with a side length of 5km, centered on the plant.

Web link to 3. public comment form:http://www.yfgg.com/article/content/view?id=5026

The manner and starting and ending time of 4. public comments

Within 5 working days from now (the letter is subject to the postmark date), the public can send letters, faxes, e-mails, etc. to the designated address of the public to express their opinions and opinions on the project and the EIA work, and please provide comments at the same time Effective contact information, the environmental impact assessment unit will truly record the public's opinions and suggestions in the "Environmental Impact Report" of this project, and the public's valuable opinions and suggestions to the construction unit, design unit and government environmental protection department.

5. the manner and time limit for the public to consult the draft environmental impact report

The public can send emails or contact the construction unit or environmental impact assessment agency by telephone, fax, letter, etc. to obtain the draft of the paper report for comments.

Publicity time limit: 5 working days from now.

6. Contact Information

Construction unit: Handan Youfa Steel Pipe Co., Ltd.

Address: Cheng'an County Mall Industrial Zone

Contact: Lian Xuetao Tel: 13931012451
E-mail: 13931012451@139.com

Evaluation Institution: Hebei Boao Project Management Co., Ltd.
Address: No. 122, Youyi South Street, Shijiazhuang, China
Contact: Jiang Hao
Tel: 0311-83055039
Fax: 0311-83055026

E-mail: boaohp@163.com

 

 


Annex
/Site/yfgg/Uploads/file/20190103/Annex 1 Public Opinion Form for Environmental Impact Assessment of Construction Projects New. docx
/Site/yfgg/Uploads/file/20190103/Attachment 1: Filing Information 1.jpg
/Site/yfgg/Uploads/file/20190103/Attachment 1: Filing Information 2.jpg
/Site/yfgg/Uploads/file/20190103/Annexes 2 and 3: Original Approval and Acceptance. doc
/Site/yfgg/Uploads/file/20190103/Annex 4: Sewage Permit. jpg
/Site/yfgg/Uploads/file/20190103/Annex 5: Admission Opinions. jpg
/Site/yfgg/Uploads/file/20190103/Attachment 6: Water Intake Opinion. jpg
/Site/yfgg/Uploads/file/20190103/Attachment 7: Power Supply Certificate. jpg
/Site/yfgg/Uploads/file/20190103/Attachment 8: Sewage Disposal Certificate. jpg
/Site/yfgg/Uploads/file/20190103/Attachment 9: Land Certificates. doc
/Site/yfgg/Uploads/file/20190103/Annex 10: Letter on Confirming Review Opinions of Planning Report (ministries, agencies and municipal bureaus).doc
/Site/yfgg/Uploads/file/20190103/Annex 11: Air Quality Status Monitoring Report_PWBSK.doc
/Site/yfgg/Uploads/file/20190103/Annex 12: Groundwater Soil Acoustic Reference Monitoring Report.pdf

Attached
/Site/yfgg/Uploads/file/20190103/Figure 1 Project Geographic Location Map. doc
/Site/yfgg/Uploads/file/20190103/Figure 2 Peripheral Relations and Evaluation Range Chart. doc
/Site/yfgg/Uploads/file/20190103/Figure 3 Project floorplan. docx
/Site/yfgg/Uploads/file/20190103/Figure 3 Project Layout. pdf
/Site/yfgg/Uploads/file/20190103/Figure 4 Monitoring layout. doc
/Site/yfgg/Uploads/file/20190103/Figure 5: Park Plan. doc

ReportBook
/Site/YFGG/Uploads/File/20190103/1.3 Youfa Hot Dip Galvanizing Reconstruction and Expansion Project Report.pdf
/Site/yfgg/Uploads/file/20190103/Report-Basic Information Form V0704.xls for EIA Approval of Construction Projects

Purchase inquiry

We will fill in the following purchase order and submit it.15 minutesget in touch with you. If you have any questions, please call 400 for manual service.

We will fill in the following purchase order and submit it.

 15 minutesget in touch with you. If you have any questions, please call 400 for manual service.

Security verification
Submission